Construction

Civil and Infrastructure Works in the UAE

The ground-level work that every project depends on, from enabling works, foundations and utility diversions to roads, drainage and external works.

The work that carries everything else

Civil works are the part of a project that no one photographs and everyone depends on. Our civil teams handle the ground conditions, structures and networks that decide whether the rest of the programme holds. We plan for what the site is likely to give us, and we build in the tolerance to absorb what it does not.

Our civil scope

  • Enabling works, demolition and site preparation
  • Shoring, dewatering, foundations and basements
  • Reinforced concrete structures, tanks and plant rooms
  • Roads, pavements, hardstanding and external works
  • Drainage, storm water and underground utility networks, including diversions
  • Civil works inside live industrial and process sites

Enabling works and utilities

Before a building can start, the ground has to be ready. That often means moving live cables and pipelines, holding back soil and water, and demolishing what is already there, without cutting off the services people still rely on. We plan each diversion and temporary works design with the project team, so the site is ready for the main works on schedule.

Building around live operations

Some of our civil work happens inside places that cannot stop, such as an operating industrial plant or a mall that is still trading. That changes how a job is planned: shorter working windows, tighter dust and noise control, and permits agreed shift by shift, so the facility keeps running while we work.

Sectors we support

Infrastructure

Site-wide civil packages, external works and utility networks for major developments.

Industrial

Civil, concrete and support works delivered inside operating industrial facilities.

Retail and automotive

Enabling works, utilities and external works for showrooms, service centres and malls.

Residential and commercial

Substructure and frame packages for towers, communities and mixed-use schemes.

Get the ground right and the rest of the programme becomes an engineering problem rather than an argument.

Planning civil or enabling works?

Request a project consultation