Federated modelling
Discipline models brought together into one coordinated view of the building as it will actually be built.
Model-led planning and coordination that de-risk construction — fewer surprises on site, and far better information at handover.
Building information modelling is part of how Al-Futtaim Construction plans work, not a deliverable we produce at the end to satisfy a contract clause. Architectural, structural and MEP models are federated and interrogated before installation begins, so the expensive conversations happen in a coordination room rather than in a ceiling void with two trades waiting.
Discipline models brought together into one coordinated view of the building as it will actually be built.
Services routes, structure and architecture tested against each other, with clashes resolved and signed off before fabrication.
The programme played against the model, so access, craneage and logistics are proved before the first delivery arrives.
Take-off drawn from the model, improving buying accuracy and reducing waste on site.
One place for current drawings, models and approvals, so everyone is working from the same revision.
Asset data, locations and documentation delivered in a structured form the facilities team can use on day one.
A model is most valuable after the building opens. Because Al-Futtaim Contracting also maintains buildings, we know what an operations team actually needs: accurate asset registers, sensible naming, real locations, and the manuals attached to the right equipment. We prepare that information during construction and pass it into computer-aided facilities management, so a building begins its life with a complete and trustworthy record of itself.
We match the level of modelling to what a project genuinely needs. A complex hospital justifies deep coordination and sequencing; a straightforward warehouse does not. Deciding that honestly at the outset — with the client, and in writing — is what keeps digital delivery useful rather than decorative.
The model earns its keep the day it stops a mistake, and again every day the building is maintained.